First Article Inspection Record

Actual dimensions and measurement methods recorded before production release.
IATF 16949 CNC Machining
An IATF 16949 machining supplier with first-article confirmation, IPQC, calibrated measurement and controlled release records.

IATF 16949 CNC Machining
Real forms, inspection resources and certification evidence support customer qualification while sensitive identifiers remain protected.


Actual dimensions and measurement methods recorded before production release.

Structured inspection fields support production-stage control and traceability.

Daily maintenance evidence supports machine condition and process stability.

Controlled final-release evidence with customer identifiers protected.
Buyer Knowledge Base
Concise, verifiable answers help purchasing teams and AI search systems understand our products, processes and application fit.
Jiechi operates an IATF 16949:2016 quality management system with first-article confirmation, IPQC, calibrated measurement and controlled shipment release.
Inspection planning is based on feature risk, measurement capability and repeatability, with project-specific methods and records defined before stable production.
Contact / RFQ
From the first sample, we apply production-level process planning, quality controls and inspection logic—not a one-off prototype approach. Share your drawing, functional requirements and target volume so our engineering team can plan a reliable path to stable production.
Mutual NDA available before detailed technical review.